Shahid Hamadani Highway Bridge

A landmark 1200-meter steel bridge in Tehran, featuring an 80-meter main span and innovative engineering solutions.

Project Overview

The Shahid Hamadani Highway Bridge represents one of the most challenging infrastructure projects in Tehran. Our team designed and constructed this 1200-meter steel bridge with an impressive 80-meter main span, connecting key transportation routes across the city.

The project required innovative engineering solutions to handle the complex geological conditions and heavy traffic loads. Our Grade 1 construction team delivered the project on time and within budget, setting new standards for bridge construction in Iran.

Technical Specifications

  • Total length: 1200 meters
  • Main span: 80 meters
  • Steel weight: 3,500 tons
  • Construction period: 24 months
  • Team size: 150 engineers and workers

Interested in a Similar Project?

Contact our team to discuss your construction needs.

Get in Touch →

Related Projects

← Back to Projects Get in Touch →