Project Overview
The Shahid Hamadani Highway Bridge represents one of the most challenging infrastructure projects in Tehran. Our team designed and constructed this 1200-meter steel bridge with an impressive 80-meter main span, connecting key transportation routes across the city.
The project required innovative engineering solutions to handle the complex geological conditions and heavy traffic loads. Our Grade 1 construction team delivered the project on time and within budget, setting new standards for bridge construction in Iran.
Technical Specifications
- Total length: 1200 meters
- Main span: 80 meters
- Steel weight: 3,500 tons
- Construction period: 24 months
- Team size: 150 engineers and workers